At what percentage does the C-switch arm the load control circuits and start the hour meter?

Prepare for the Naval Aircrewman – Mechanical Test. Study with flashcards and multiple choice questions, each question comes with hints and explanations. Get exam ready!

The C-switch is designed to control the operation of load control circuits and is pivotal in starting the hour meter when a specific operational threshold is reached. In this context, the percentage at which the C-switch engages is established as 95%. This means that once the system loads surpass 95% of the designated capacity, the switch is activated, signaling the load control circuits to commence operations. This engagement is critical for ensuring that the hour meter tracks time accrued under significant load conditions.

Using this functionality ensures that maintenance and operational logs are accurately maintained, which is essential for scheduling maintenance, understanding performance trends, and addressing potential issues proactively. Thus, 95% is the operational threshold indicating when the C-switch activates key system components, ensuring proper monitoring and control within the operational framework.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy